Contact Us

Contact Person : Alice Xiao

Phone Number : +86-15038533682

WhatsApp : +8615038533682

Free call

Graphical Controller Cabinet Production Line Brake CNC Press Bending Machine

Minimum Order Quantity : 1 Set Price : negotiable
Packaging Details : 1. Foam board fills the gap at every level. 2.Foam paper protects each piece. 3. Bubble Wrap or PE foam on the top. Delivery Time : 150 Days
Payment Terms : T/T, L/C Supply Ability : 550 Units/Year Units/Year
Place of Origin: Luoyang, Henan, CHINA Brand Name: CBNT / ODM
Certification: ISO9001/ Others Model Number: CBNT-UN2200HBZHSCX

Detail Information

Type: CNC Bending Machines Function: Auto Bending And Welding For Metal Cabinets
General Use: Building Material Shops, Manufacturing Plant Short Edge Bending Machine: Regular Size: 1850*2220*1950mm
Long Edge Bending Machine: Regular Size: 1650*2300*1650mm Bending Speed: ≤ 0.5s
Material Scope: Q235 Color: Red/ Yellow/ Blue/Customized
Capacitance: About 60KVA (380V、50Hz) Warranty Of Core Components: Mainly Parts: 1year, Other Parts: Lifetime
Weight: 15~20 Ton Barometric Pressure: 0.5MPa~0.6MPa
Size Of Equipment: L14m * W4m * H3.5m Business Type: ODM Service
Port: Qingdao Port/ Shanghai Port/ Tianjin Port/ Others Size: About: Length11,000mm * Wide4300mm
Product Range: L=2100mm; W=950mm (finished) Height Of Equipment: 900mm ± 50mm (from The Ground)
Plate Material Thickness: Cold-roll Steel Sheets 0.5-1.2mm
High Light:

Graphical Controller Cabinet Production Line

,

Graphical Controller CNC Press Bending Machine

,

Cabinet CNC Press Bending Machine

Product Description

Graphical Controller Cabinet Production Line Brake CNC Press Bending Machine 0

 CNC Automatic Bending Equipment Production Line

    

     Selecting our shelf boards automatic bending and spot welding production line, the cutting plate can be bent at both ends of the short side of the plate through the double end bending center, then through the long sides of the bending center of the plate, which can bend multiple times at the same time. Through the conveyor rack to the welding line, and completes the reinforcement action through the truss robot arm.

 

 

     1. Technical Data

 

No.

Equipment name

Brand

Size

Amount

Function

1

 Double ends of short edge bending machine

 

 

 

 

 

 

 

 

 

CBNT,

ODM&OEM

1850*2220*1950mm

1

Double ends bending

2

Double ends of  long edge bending machine

1650*2300*1650mm

1

Double ends bending

3

Leveler/Flatting machine

 

1

Correction leveling/ Flatting 

4

Uncoiler

 

1

Uncoil

5

Welding line

 

1

spot welding, dot welding;

6

Truss robot

 

1

Reinforce-bar loading

7

Truss robot

 

1

Unloading and Stacking

8

Hand cart         (reinforce-bar)

 

2

Put the reinforce-bar for using

9

Operating system

 

1

 

10

Power

 

80KW

 

 

 

 

 

 

2. Description of equipment:

  The last step, use the truss robot to put the reinforce-bar on the shelf to finish the welding production. Using the truss robot to unload and stack to complete the shelf. Monthly output reaches 25,000pcs.

  

Graphical Controller Cabinet Production Line Brake CNC Press Bending Machine 1

 

  _20210715165943.jpg_20210715165948.jpg_20210715165952.jpgBack.png

    

 

 

  3. UN2200hbzhscx Shelf production line configuration 

 

Specifications

Shelf Automatic production line

Size of equipment

 L14 m * W4 m * H3.5 m

Technological process

Uncoiler→Leveling→Two ends bend→Two sides bend→Rowing welding machine→Truss robot finished and Storage

Worktable production line-height of equipment:

Apart from the ground 900 ± 50mm

Material Scope

Material is Q235, stainless steel roll, and other flexible sheet metal

Barometric Pressure

0.5-0.6Mpa

Capacitance:

About 60KVA(380V,50HZ)

Thickness:

0.5-1.2mm

Product Range

Comply with the product drawing requirements confirmed by both parties/ Required by Customer

Metal sheet color

Red and black/ blue and white/Required by customer

Machining accuracy

Processing accuracy: the ultimate deviation accuracy of the tolerance dimension on the drawing is GB1804-m.

Bending speed

0.5s

CNC system

SYNTEC

Operational software

UNZ10 (Free update)

Main accessories brand

 

Robot brand and model

Truss robot or Borunte robot

Vacuum generator, suction cups

SMC

Original pneumatic unit and air cylinder

AIRTAC or SMC

Ball-bearing and linear guideway

HIWIN

Axle bearing

NSK

Reduction gearbox

ZD(Zhongda)

Programmable control unit(PCU)

SYNTEC (Chinese operation)

Inverter

SYNTEC

Low voltage appliances, buttons, indicator lights, air switches

Schneider

 AC contactor

Schneider

 Sensor

Panasonnic

Intermediate relay

Schneider

Servo motor

SYNTEC

Wire and cable

Delrou

 

General Features

-New EU streamlined design

-The whole frame of the press brake adopt integrated welding, and by tempering to eliminate the internal stress

-The press brake frame adopt shot blast to remove rust and is sprayed with anti-rust treatment

-The frame is formed by the imported CNC three-dimensional machining center in one process, which ensures the parallelism and verticality of each mounting surface.

-The main oil pump does not apply for work under the drive of the servo main motor, and the energy consumption is 60% lower than that of the general CNC press brake machine

-The machine oil temperature is stable, which extends the service life of various components of the hydraulic system

-More technical innovations to ensure the quality of bending, and powerful, easy to operate

-The press brake adopt the latest high-frequency hydraulic control technology, which is faster, more efficient, and more stable

-The best parameter ratio, the optimal core configuration, the performance is stable, the operation is more convenient, and the bending of various workpieces in complex shape can be realized

 

SUPPLY ABILITY AND TRADING TERMS

Terms of payment

-T/T, 10% deposit before design the drawing draft, 60% before production, 20% before loading, 10% the balance after the adjustment and installation.

 Lead-time

1. Design picture draft: about 2 weeks

2. Production line: about 3 months

3. Technical training: 3days ~1 week. The company can also provide in-door installation, equipment debugging, technical training services, to guide the plant establishment and production.  

APPLICATION

 Workshop/ Production Department/ Factory / Storage / Company / Manufacturing shop

 

 

company profile.jpg

 

.jpg_06.jpg

Factory Photo.jpg

 

packing way-f.jpg

You Might Be Into These
Get in touch with us

Enter Your Message

alice@hi-cabinet.com
+8615038533682
+86-15038533682